Convert the last stud on the first wall sideways and overlap it about midway previous the connecting wall to build drywall backing. Discovered mould in my basement about per month in the past - result of leak in water tank. H2o shot into drywall and Basis. Replaced tank and Servpro https://basement-finishing82046.aboutyoublog.com/37424049/about-basement-finishing-contractors